Client: Consorzio di Bonifica Litorale Nord
- Execution of 5 10 m drill cores for chemical and physical characterisation in the lake.
- Barge assembly in situ
- Execution of nr 2 15m core drillings and nr 6 SPT with geotechnical purposes in the storage site