Client: Interoute
PIP (Permit in principle)
- Preliminary examination for concession of maritime public property easements and operation permits
Environmental and seabed characterisation (ref. DM 24.01.96)
- sampling, analysis and report.
- ROV Video
Inshore survey
- Inshore bathymetric, geomorphological and stratigraphic survey.
- Geotechnical surveys.
Environmental impact assessment (Italy).